Price each job yourself
Pick the kit and type one price: what the customer pays, or the price before incentives. Jouli works out the rest, from the certificates and rebates to the GST and the payment stages.
The switch: Admin → Products & pricing → How you price → Rate card or your own price. Only an owner can change it. The price itself: Make a proposal, step 3, Site & price, under Price.
Switch your company to it
- Open Admin → Products & pricing → How you price → Rate card or your own price.
- Choose Price each job yourself, the second of the two cards you chose from when you signed up, and press Save rate card or your own price.
- It says “Saved: you price each job yourself. Sent proposals are unchanged.”
You can switch back to Rate card the same way at any time. Neither change touches a proposal you’ve sent. A new company makes this choice on its first visit.
When you price each job yourself, nothing asks what your kit costs you. A product can go in your catalogue with its cost left blank. Margin isn’t tracked, so Show margins is off, and the margin floor, the margins and the discount rules apply only to a job priced from a rate card.
Set your minimum prices
Open Admin → Products & pricing → How you price → Minimum prices and set the least a job may go for, inc GST and before incentives: Solar, $ per watt, Battery, $ per usable kWh, Heat pump water heater, $ each, Air conditioner, $ each and EV charger on its own, $ each, for a job that is only a charger. They are typed inc GST whichever way your company types its other prices. Press Save prices to keep them.
- Below the minimum, you and back office are warned, and the proposal can still be sent.
- A rep’s price below it, or a team lead’s, waits for approval before it can be sent, as a held discount does.
- With no minimum for a kind of system, reps can’t price that kind of job themselves.
Type the price in Make
- Build the job as usual: the customer, the roof and the system. See your first proposal.
- In Site & price, under Price, Price from is set to My own price. Rate card can’t be chosen: your company has no rate card to price from.
- Under What the number means, choose Customer pays or Price before incentives, then type it in the box: Customer pays (after incentives, inc GST) or Price before incentives (inc GST). Switching what the number means keeps the same deal.
- Under the box, the breakdown is worked out as you type, all inc GST: the price before incentives, any extra priced on its own, each certificate and rebate taken off, and what the customer pays. If the incentives change after you’ve typed what the customer pays, it asks which figure to keep.
- Press Generate draft →. Until a price is in, the price panel says “Type what the customer pays, and Jouli works out the rest.”
A typed price takes no discount on top, so the reasons for money off aren’t offered. Type the price you want.
What the customer sees
The system is one line, such as “6.6 kW solar and 10 kWh battery, supplied and installed”, naming each product, with installation, network approval and certificates included. The certificates and any rebate are still listed, and the payment stages follow your contract terms. An extra with a usual price is its own line at that price. One with no usual price is inside the job’s price, and the line says so. See extras you charge.
One job by hand, at a rate-card company
An owner can price a single job by hand: in Site & price, under Price, set Price from to My own price and type the price as above. Back office can too once you tick Back office can set a job’s price as well as the owner under Admin → Products & pricing → Discounts & custom prices. Reps can’t: they can ask for a price with the reason Ask the owner for a special price, which waits for the owner to decide. See discounts and custom prices.
When you press My own price, Jouli shows under the box what your rate card prices the job at, until you type yours. It still prices the same job on your rate card: under the breakdown, a line sets the two side by side, with how much less or more yours is and whether it keeps your margin floor. The owner, and back office with Show margins, see the margin it leaves too. A typed price below what the job costs you on your rate card, or one that leaves less than your margin floor, can’t be generated: the panel says so before you press Generate draft →. At or above the rate card’s price, nothing is refused.
Next: Upload your supplier’s price list
On the website: Pricing engine