Extras you charge
Extras are the site costs on top of the system: a tile roof, a switchboard upgrade, a long cable run. You set what each costs the customer, and your reps tick what a site needs.
Set them in Admin → Products & pricing → Extras & packages; an owner or a settings admin changes them there, and back office sees the list and can add one. Tick them on a job in Make a proposal, step 3, Site & price, where anyone who makes proposals can add a new one with + New extra.
Add or change an extra
- Open Admin → Products & pricing → Extras & packages. Each row is one extra.
- Press + Add an extra and fill in its Code, the name the customer reads, and how it’s Priced: Per job, Per panel, Per unit, Per metre, Per km, Per kW of solar, After inspection or No usual price (in the job’s price).
- Type the amount in $ ex GST. If your company types its prices including GST, the column reads $ inc GST instead, and Jouli takes the GST off when it saves. An owner chooses this under How you type prices: see your prices and margins.
- For one priced per metre or per km, Free m / km is how many are included before the price starts. Blank is none, and the proposal says none.
- Under Applies to, choose Any job, Solar jobs or Battery jobs. Add a Note if the proposal should say more.
- Press Save prices. The button says which rate card version it makes.
Remove takes an extra off from the next version. Proposals already sent keep the version that priced them. If you price in more than one state, choose a state under Costs shown for in How you price first: extras can differ by state.
A row that reads “Priced by supply phase or a special rule — set up with Jouli” can’t be changed here. Ask us to change it.
Extras that aren’t itemised
Tick Not itemised for a cost that belongs in the price but not on its own line, such as freight or consumables. Its price sits inside the first line of the proposal, so the total is exactly what it would be with the line shown. Your job sheet and the office still see it. Never use it for a charge the customer should see named.
Queensland’s signalling device
A Queensland renter-rebate job needs a generation signalling device. Add an extra with the code signalling-device, one fixed price that applies to any job. If your inverters have one built in, set it to $0.
Ticking extras on a job
In Site & price, search the extras or open a group (Roof & access, Switchboard & electrical, Battery placement & safety, Site & logistics) and tick what this site needs. Your own extras follow the groups. Where an extra has a quantity, its box appears once it’s ticked: type the metres, panels or units there. If the site needs nothing, leave it: Nothing extra on this site says so.
Only the extras your rate card prices in the job’s state can be ticked. See site extras in your first proposal.
Add a new extra from a job
Anyone who makes proposals can add an extra the list doesn’t have yet, without leaving the job.
- In Site & price, press + New extra.
- Type its Name on the proposal and its Price to the customer, $ ex GST ($ inc GST if your company types prices including GST). The other figure shows beside it as you type.
- Choose how it’s Priced (each, per metre, per panel or per kW of solar) and its Group.
- Press Add this extra. It says “Added: …”, the extra is ticked on this job, and it’s on your company’s list for every state you price, as a new rate card version.
A name already used in the same group is refused. Changing or removing an extra stays with the owner and the settings admin, in Admin → Products & pricing → Extras & packages. Back office sees that section as a list of each Extra and its Price to the customer, with the same form to add one. Each extra added is in Admin → Account → Activity.
Free or typed extras from reps
A rep or team lead can include an extra at no charge, or type the price on a line priced after inspection, and the proposal can be sent. Each one is noted on the job’s timeline in their name. The floor still holds, and a discount past your approval line still waits for you.
To approve those yourself, an owner ticks Hold reps’ free or typed extras for my approval at the foot of Extras you charge. It saves at once. Then those proposals wait until you or back office generate them. It starts off.
If you price each job yourself
An extra with a usual price is its own line on the proposal, at that price. One with No usual price (in the job’s price) is part of the price you type, and the system’s line says it includes it. See pricing each job yourself.
Next: Discounts and custom prices
On the website: Pricing engine