Guide 16 of 62

Packages: save a system your team can start from

A package is a system you sell often: its panels, battery, charger and extras, saved with a price of its own if you want one. Your reps add it to a proposal in one go.

WHERE TO FIND IT
Saved from Make a proposal: Save this system as a package… on Review & send, for an owner. Used in Roof & system, under Use a package. Listed and removed under Admin → Products & pricing → Extras & packages → Packages.

Save a package

  1. In Make a proposal, build the system: the panels and how many, the battery and its size, an EV charger, the supply and any extras. Choose the panel by name, not Auto — Jouli picks: a package names its products.
  2. Press Generate draft →, then Save this system as a package… on Review & send.
  3. Name it as your reps will see it, for example “6.6 kW + 10 kWh battery”.
  4. Type its price including GST, before certificates and rebates, or leave it blank to price it item by item.
  5. Check what it holds and its price, then press OK. Cancel saves nothing. It says “Saved as a package”, and your rate card moves to a new version.

Saving under a name you already use asks first. OK replaces that package with this system; proposals already sent keep the price they were sent at.

Start a proposal from one

  1. In Roof & system, open Use a package and choose it under Package.
  2. The job takes its system: the panels and count, the battery and size, the charger and the supply, with its extras ticked. Anything else you’d ticked stays.
  3. Under it, a line says what the package holds and how it’s priced.

Choose No package — build it below to price the job item by item instead.

How a package is priced

  • With a price, the job is priced at it, before certificates and rebates, while it stays that system. Certificates still come off per product.
  • Change a product or its size and the job is priced item by item from your rate card, and the price check says why.
  • Extras, a water heater and air conditioners added to the job are priced on top, each at its own price.
  • Your margin floor still holds. If a package’s price would take a job below it, the draft says so.
  • Without a price, the package only fills in the system, and the job is priced item by item.
  • A package’s price is always typed including GST, even when your company types its other prices excluding GST.

Your packages in Admin

Admin → Products & pricing → Extras & packages → Packages lists each Package, What is in it and its Price inc GST (or Item by item). Remove takes one off; proposals already sent keep the price they were sent at.

A package marked Not at its own price no longer prices at its price, for example after a product in it changed. The row says why. Build it again in a proposal and save it under the same name to replace it. A supplier price list names any package its new costs would affect before you update.

Setting the rate card a package is checked against is in your prices and margins.

Next: Extras you charge

On the website: Pricing engine