Link your products to the approved list
A panel, inverter or battery earns certificates only once it’s linked to its row on the CEC list. Most link by themselves. This is how to find and link the rest, and what a listing’s end date means.
Admin → Products & pricing → Products, or ⌘K and type “catalogue”. An owner or a settings admin sees it. While a product isn’t linked, Admin’s home, Needs attention, says how many with Review.
Why linking matters
Certificates come off the price only for a product that’s on the CEC list (the Clean Energy Council’s list of approved products) on the day the job is priced. Jouli reads each product’s listing, with its dates, from Jouli’s product list. Your catalogue can’t type one in.
- A product you add from Jouli’s product list is linked as you add it. See finding products.
- A product that came in another way, such as an older catalogue, may not be. Until it’s linked, it earns no certificates and a draft with it is held. See why a proposal is held.
- A custom product is your choice to quote without certificates, so it’s never linked.
Find the ones that aren’t linked
Above the Catalogue table, a line says how many aren’t linked: “3 not linked to the CEC list, so they earn no certificates.” Each one’s Approval column shows a light and Link. Press Link them to list only those; press it again (Show every product) for the whole catalogue.
Link every certain match at once
Press Link all matches (N). Jouli links each product whose match is certain: the same maker, and the model number exactly. It says “Linked 2 products to the CEC list.” Their specs and costs stay as they are. Jouli also does this by itself when the catalogue is saved, and each night.
Link one by hand
- Press Link on its row. Add a product opens, searching that brand, and says “Pick the CEC row for …. Its specs and costs stay as they are.”
- Find the exact model and press Match … to this on its row. Cancel stops.
- It says “Linked.” The row now reads On the CEC list, with the day its listing runs to.
No certain match
Under the line, N with no certain match on Jouli’s list to look at opens the products Jouli couldn’t match, each with why, Link, On the approved list and Mark it custom.
Press On the approved list only after you’ve found the exact model on the CEC’s own list. Its certificates are then included on your word, and each job sheet says who confirmed it and when. The row reads On the list, on your name’s word, with the date. Once Jouli’s list has its row, it’s linked and the list’s dates take over.
Not on the CEC’s list, or you’d rather not claim for it? Press Mark it custom. Jouli asks first. From then, every new proposal with it is quoted without certificates for it, rather than held; a draft that was held needs generating again. To claim them again, remove it and add its row from Jouli’s product list.
When a listing ends
Every listing has an end date. The Approval column warns you first and then says what changed:
- Listing expires …: it ends within 90 days. A draft with it also says to install before then, or the certificates fall away.
- Listing expired … · no certificates or Delisted … · no certificates: a job priced from that day claims none, and its draft is held.
- Not listed until … · no certificates: its listing hasn’t started yet.
For a held job, swap the product for a listed one and refine it. Proposals already sent keep the products and prices they were priced with.
Heat pump water heaters and air conditioners follow their registers instead. A water heater’s STCs come from the CER heat pump register (On the CER register · STCs), and its VEECs in Victoria from the VEU register. An air conditioner follows the VEU register: On the VEU register or Not on the VEU register · no VEECs. See certificates.
Next: Set your prices and margins
On the website: Pricing engine