Book an install, mark it installed, put it on hold
A signed job moves through Jobs as you book it, install it and record it: To book, Booked, Installed. One button on its row does the next step.
Jobs, in the Delivery group: Book install on a job in To book, Mark installed on a job in Booked, with Put on hold and Stock delivered in the same panel. The Dashboard’s To book list has Book too.
Book the install
- In Jobs, on a job in To book, press Book install. A side panel opens (a sheet from the bottom on a phone), headed with the customer and showing the suburb, the system and the job reference.
- Pick the Install date. Add a Note if you like: who is going, what the customer was told.
- Press Book install. The cockpit says “Booked for” and the day, and the job moves to Booked.
The date can’t be a day that has already passed. If the customer is in a door-knock sale’s cooling-off period and the date falls inside it, the panel says “Not allowed: this door-knock sale’s cooling-off period runs until the end of” the day, “so nothing may be installed before then. Pick a later day.”, and Jouli won’t save it. See deposits and cooling-off.
Mark it installed
- On a job in Booked, press Mark installed.
- Installed on starts at today. Change it to the day the work was done if that was earlier. It can’t be a day still to come.
- Add the Inverter serial and, on a battery job, the Battery serial.
- Press Mark installed. The job moves to Installed.
A job still waiting for your countersignature can’t be marked installed: the contract isn’t formed yet. Nor can a door-knock sale on a day inside its cooling-off period. Nor can a job while a variation of it waits to be signed by the customer and countersigned; get it signed by both, or void it, first.
Put it on hold
- Open the job’s panel with Book install or Mark installed, and press Put on hold under the main button.
- Add a note if you like, and press Put on hold again to save.
The row shows On hold and stays in its stage, and its job sheet says “Signed — on hold”: don’t order stock or attend. Book install starts it again.
Stock delivered
- When the stock for a signed job arrives, open the job’s panel with Book install or Mark installed, and press Stock delivered under the main button.
- Day the stock arrived starts at today; change it if it came earlier. It can’t be a day still to come.
- Press Mark delivered.
The row says Stock delivered and the day, and the stock payment falls due from that day (otherwise from the install day). Finance shows the day under the stock payment, and an owner or back office can mark it there too. Marked by mistake? Open it again and press Not delivered. Each mark is saved with your name and kept in Admin → Account → Activity. An owner, back office or installer can mark it. See getting paid.
Who can
- An owner, back office or an installer, on any signed job. An installer’s panel has no note.
- A rep, on their own jobs, where your company lets reps quote, and not over a record someone else made. A team lead, on their reps’ jobs too.
- A read-only manager and accounts can’t.
On a phone or a tablet, each job in Jobs is a card with its actions wrapped underneath, and the row’s … lists the same actions at its top (Book install or Mark installed, Stock delivered), so a booked job can be marked installed from a phone.
Cancelling or refunding a signed job stays with an owner or back office: in Proposals, click the job’s row, press Outcome on its customer card, then What happened. A cancelled job leaves Jobs. See Void, cancel, replace.
What it keeps
These buttons write the job’s outcome, the same record as Outcome on Proposals: the date, the serial numbers and the note. The panel shows the last one beside its button, with the day and who recorded it, and each earlier outcome is kept with the job. The job sheet’s band follows it (“Signed — install booked” and the day, then “Installed”), and Reports counts what’s installed. See the job sheet.
Next: Get paid: payment stages and the Finance tab
On the website: Jobs & delivery